There are 2 images added on 3 December 2006
Bionix 25  
Initial Operational Capability (IOC): 1999
Total Production: ?
Origin: Singapore
Corporations: ST Kinetics
Parent System: Bionix
Initial Operational Capability (IOC): 1999
Total Production: 300
Total Cost: USD$600 million
Family Members: Bionix 40/50, Bionix AVLB, Bionix ICV and Bionix RCV
Reviews
There are no reviews so far

Description: The Bionix multirole Armored Vehicle was designed by Singapore Technologies to meet the requirements of Singapore's Armed Forces for an M113 replacement. It features improved modular armor for troops and vehicle survivability as well as technology insertion capability for future growth. The Army of Singapore awarded Singapore Technologies a $600 million contract for Bionix procurement. Bionix multirole armored vehicles deliveries started in early 1998.

The Bionix 25 features a 25mm turret-mounted gun and 3 7.62mm machine guns to perform infantry fire support missions even at night thanks to an Infrared sensor package. It can accommodate up to 10 soldiers, 3 crew and 7 passengers.

Bionix 25 Specifications

Crew: 3
Troops: 7
Dimensions
Height: 2.60 meter (102 inch)
Length: 5.90 meter (232 inch)
Main Gun Caliber: 25 millimeter
Width: 2.70 meter (106 inch)
Power
Power: 475 shp (354 kW)
Speed
Cross Country Speed: 7 mps (25.2 kph)
Top Speed: 19.5 mps (70 kph)
Weight
Combat Weight: 21,500 kilogram (47,399 pound)
CEP: Circular Error Probable
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)

Operators & Related Equipment


OperatorsItems

Grand Total ?1
 
Copyright © 2003-2017 deagel.com website. All rights reserved.
This website has been optimized for HTML 5 and CSS 3.