There are 4 images added between 25 November 2011 and 1 April 2015
Gowind OPV  
Initial Operational Capability (IOC): 24 November 2011
Total Production: 1
Also Known As: OPV Gowind L'Adroit
Origin: France
Corporations: DCNS
Parent System: Gowind
Initial Operational Capability (IOC): 24 November 2011
Total Production: 5
Production Cost: EUR€1.1 billion   (USD$1.2 billion)
Family Members: Gowind 200 and Gowind 2500
Reviews
There are no reviews so far

Description: The Gowind Offshore Patrol Vessel (OPV) is a ship built by DCNS using its own funds to conduct a wide range of government missions at sea. DCNS took the decision of going with the self-funded Gowind OPV in May 2010 with the aim to promote a new product in the OPV category. The ship will be available for the French Navy for three years for missions such as area surveillance, anti-piracy, counter-terrorism, fisheries policing, drug interdiction, environmental protection, humanitarian assistance, search & rescue at sea, and maritime safety & security (MSS). New improved construction methods will make possible to complete the first ship within 20 months between first cut and delivery to the customer in late 2011.

The 90-meter Gowind OPV design includes full provision for an organic helicopter and reduced crewing. The ship provides covert deployment of fast commando boats in less than 5 minutes and full provisions for UAV (unmanned aerial vehicle) operations.

Gowind OPV Specifications

Crew: 30
Troops: 30
Dimensions
Beam: 13 meter (43 foot)
Draft: 3.30 meter (10.8 foot)
Length: 87 meter (285 foot)
Performance
Max Range: 8,000 nautical mile (14,816 kilometer)
Speed
Economical Speed: 12 knot
Top Speed: 21 knot (38.9 kph)
Time
Mission Endurance: 21 day (504 hour)
Weight
Full Displacement: 1,100 ton
CEP: Circular Error Probable
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)

Gowind OPV News

There are 2 news between
26 Oct 2010 and 25 Nov 2011
Friday, November 25, 2011Adroit Gowind Offshore Patrol Vessel Arrives at French Navy's Toulon Homeport
Tuesday, October 26, 2010DCNS and French Ministry of Defence Sign Gowind OPV Availability Agreement

Operators & Related Equipment


OperatorsItems

Grand Total 11
Sensor Systems
EOMS NG

Gowind OPV Ship Listing


SerialNameStatusLaunch DateCommissionDecommission
P725 OPV Gowind L'Adroit17 Jun 201124 Nov 2011-

Copyright © 2003-2017 deagel.com website. All rights reserved.
This website has been optimized for HTML 5 and CSS 3.