Friday, January 09, 2009

deagel.com

MUOS


IOC: 2010
Total Production: 6
Total Program's Cost: USD$6.7 billion

Unitary Cost: USD$1.1 billion

Also Known As
Mobile User Objective System


Origin
United States of America


Program Status:
Under Development

Contractor/s
Boeing
Ericsson
General Dynamics
Harris Corporation
Lockheed Martin
Northrop Grumman

Description: The Mobile User Objective System (MUOS) is a geosynchronous communications satellite network designed to replace US Navy UHF F/O (UFO) satellites constellation. The program total cost was estimated at about $6 billion for 10 spacecraft with the first MUOS satellite scheduled for launch in 2010 (initially the first launch was expected in 2008). Two industry teams led by Lockheed-Martin and Raytheon competed for the MUOS contract until September 2004, when Lockheed-Martin team was selected to carry out the program.

The MUOS constellation will provide UHF secure voice, data, video, network-centric communications in real-time to US mobile warfighters through 2030 and will be fully interoperable with the Joint Tactical Radio System (JTRS) and current radio systems. The system will be fully compatible with UFO system and legacy terminals. The data transmission rate would be approximately 40 Mbps. Users will be able to access a 64 Kb per second beyond the line-of-sight communication services.

The US Navy awarded a $2.11 billion contract to a Lockheed-Martin lead team on September 24, 2004, for the development of the Mobile User Objective System (MUOS), next generation narrowband military satellite communications. The MUOS slated to replace the current UHF follow-on or UFO will consist of a multi-beam geosynchronous constellation, an orbit spare (satellite), the ground system supporting the satellite and network control, and a common air interface waveform.

The contract awarded to Lockheed-Martin led team encompasses development and production of two satellites (one active duty, one spare) as well as associated ground equipment. The contract includes an option on three additional satellites that could increase the contract value to $3.26 billion. The work contracted by Space and Naval Warfare Systems Command (SPAWAR), San Diego, California, is expected to be completed by March 2011. The first launch is anticipated in 2010. If all options are exercised, the contract would be complete in 2015.

In addition to Lockheed-Martin Space Systems, the MUOS team also includes General Dynamics C4 Systems; Boeing Satellite Systems; Ericsson; Harris Corporation and Northrop-Grumman. Lockheed-Martin's A2100 bus will serve as the MUOS spacecraft platform. General Dynamics will be responsible for the integrated ground segment and the user-entry. Boeing will provide a significant portion of the UHF payload capability. Harris Corporation will supply the MUOS spacecraft antenna. As of September 2004, the program will require up to five satellites instead of 10 as originally planned. InterDigital, Epsilon and Pinnacle Network System are also involved in this project.

In early November 2004, Lockheed-Martin at MILCOM 2004 in Monterey, Califronia, announced that the MUOS satellite will integrate third-generation (3G) commercial cellular technology. Therefore, MUOS system will transmit text, voice, video and multimedia combining 3G Wideband Code Division Multiple Access (WCDMA) waveform and Universal Mobile Telecommunications System (UMTS) infrastructure. The 3G cellullar technology will be fully compatible and will support advanced features of Joint Tactical Radio System (JTRS) terminals now under development.

In March 2005, Lockheed-Martin successfully completed the Preliminary Design Review (PDR) ensuring that the system meets or exceeds the US Navy requirements.

News

 

Operators

United States of America / 6 / Planned


Image Gallery


Internet Resources
Lockheed Martin MUOS

Notes
(*) lead contractor
IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)


Last Updated: Saturday, December 20, 2008