LHD Canberra


Program Status: Under Construction
IOC: January 2013
Total Production: 2
Production Cost: EUR€1.4 billion   (USD$1.8 billion)
Unitary Cost: EUR€706 million   (USD$914 million)
Origin: Australia and Spain

Contractor/s: Navantia* 65% and Tenix 35%

Description: The Landing Helicopter Dock (LHD) is an amphibious assault ship class being constructed by Navantia of Spain and Tenix of Australia for the Royal Australian Navy (RAN). Australian LHD is based on Spanish Navy's Juan Carlos I ship. Navantia, Tenix and the Australian government signed in Melbourne the LHD procurement contract on October 9, 2007. The contract was valued at 1,411.6 million Euro for the construction of two ships (LHD-1 and LHD-2). Navantia's stake in the LHD program is valued at 915 million Euro comprising ship's design and construction, power plants and platform control system totaling 9.5 million hours workload.

The LHD ship will feature an inclined well dock to support watercrafts and landing craft operations in Sea State 4; a large and hardened flight deck with ski jump enabling operations of medium- and heavy-weight helicopters as well as operations of unmanned aerial vehicles and VSTOL aircraft in Sea State 5; the facilities to accommodate aircraft, containers, armored vehicles and other equipment as well as 1,124 troops; and gas turbines based propulsion system.

According to Tenix documentation, the RAN will provide LHD ships with NH90 and Tiger ARH helicopters capable of operating from the ship's flight deck. On November 23, 2007, Tenix awarded Saab a AUD105 million contract for the development and procurement of 9LV Combat Management System and the naval surveillance radar Sea Giraffe to be installed on LHD ships. The lead ship, LHD-1, will be handed over by 2013 and the second ship, LHD-2, will be delivered by 2014.

Parent system is the Juan Carlos I
IOC: 30 September 2010
Total Production: 3
Production Cost: USD$2.5 billion
Other Family Members: Juan Carlos I

 

:: Reviews ::

There are 0 reviews
so far

Write your review


 


 

:: Specifications ::


Crew: 279
Troops: 1,124

Dimensions
Beam: 32 meter
Draft: 7.18 meter
Length: 231 meter

Performance
Max Range: 6,100 nautical mile (11,297 kilometer)

Speed
Cruise Speed: 19 knot (9.77 mps)
Economical Speed: 15 knot
Top Speed: 20.5 knot (10.5 mps)

Time
Mission Endurance: 50 day

Weight
Full Displacement: 27,851 ton

:: News ::

There are 6 news between
9 Oct 2007
and
29 Sep 2011

:: Operators ::

Operators
  Country   Items   Country   Items
  Australia 2        

 

fully confirmed operational planned retired cancelled destroyed    

:: Related Equipment ::

Related Equipment
    Qty
  Carrier & Landing Ships
  LCM-1E x4
  Combat Helicopters
  Tiger ARH  
  Ship Sensors
  Sea GIRAFFE  
  VAMPIR NG  
  Tactical Support Helicopters
  NH90 TTH  

:: Ship Listing ::

Ship Listing
  Serial Ship's Name Flag   Keel Laying Launch Date Commissioning Decommissioning
  LHD-1 HMAS Canberra 23 September 2009 17 February 2011 2014 -
  LHD-2 HMAS Adelaide October 2010 - 2015 -

:: Image Gallery ::

There is 1 images added on
18 Feb 2011

:: Notes & Resources ::

LHD

 

Last Updated:
Thursday, March 8, 2012

(*) lead contractor

IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)

Leave Feedback | Operators map | Compare Carrier & Landing Ships

 
Copyright © 2003-2012 deagel.com All rights reserved