| Sunday, September 07, 2008 |
 |
|
|
Viking
IOC: 2005
Total Production: 10
Origin:Sweden
Contractor/s:
Howaldtswerke-Deutsche Werft GmbH, Odense Staalskibsvaerft
Description:
The Viking-class submarines are the result of a multinational program involving Sweden, Denmark and Norway. The Viking submarine will feature stealth technology and will be built employing an advanced modular construction technique in order to achieve the low acquisition cost requirement. An intergraded weapon system will coordinate weapon and sensors to achieve unprecedented performance.
The Stirling air independent propulsion (AIP) system will be provided for the Viking submarines. The Stirling AIP employs liquid oxygen and diesel fuel in a pressurized combustion chamber. It will enable Viking submarines to operate in stealth mode during extended underwater patrols.
The Swedish, Danish, and Norwegian Navies plans to purchase 2, 4, and 4 Viking-class submarines starting in 2005. Finland is an observer of the Viking and eventually could order additional Viking submarines.
Specifications
Accommodation: Crew 28
Dimensions: Height 11 m, Length 60 m, Width 6.7 m
Weights: Max Weight 1,700 t
|
|
Notes
(*) lead contractor
IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m) Kilometers (km) Nautic Miles (nm) Inch (in) Yard (yd) Foot (ft) Millimeter (mm)
Pound (lb) Kilogram (kg) kN (KiloNewton) Ton (t)
Meters per Second (mps) Kilometers per Hour (kph) Knot (kt) Miles per Hour (mph)
Liter (l) Galon (gl)
Year (yr) Minutes (min) Second (sec)
Shaft-Horse-Power (shp)
Last Updated: Sunday, August 24, 2008
Leave Feedback >>
|
|
Copyright © 2003 - 2008 deagel.com. All Rights Reserved.