IOC: 2010
Total Production: 3
Production Cost: GBP£400 million

Unitary Cost: GBP£133 million


Origin
United Kingdom


Program Status:
Under Construction

Contractor/s
VT Shipbuilding



Air-to-Air Missiles:
Mica RF

Guided Missiles:
MM40 Exocet

Guns & Missile Launchers:
Vertical Launch Mica

Protection Systems:
MASS

Description: The Khareef is a class of Ocean Patrol Vessels (OPVs) being built by VT Shipbuilding, a VT Group subsidiary, for the Royal Navy of Oman (RNO). The procurement contract between VT Group and the government of Oman for three ships was signed on January 16, 2007. The Khareef program is slated to last for five years valued at £400 million and will provide initial support. The first ship will be delivered to Oman in early 2010 with the other ships being delivered in six-month intervals.

The Khareef-class ships will be equipped with MASS countermeasures, Exocet anti-ship missiles and VL Mica ship-based air defense system which is based on the beyond visual range Mica air-to-air missile. These key elements of the ship's weapon system have been procured by the Sultanate of Oman separately.

Specifications
Dimensions: Length 100 m

Khareef - Contracts, Orders & Sales

  see transactions report


 



News

 

Operators

Oman / 3 / Planned

Ships

OPV1 Khareef / Under Construction

Commissioning: 2010

OPV2 / Planned

Commissioning: 2010

OPV3 / Planned

Commissioning: 2011


Notes
(*) lead contractor
IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)


Last Updated: Saturday, November 22, 2008

Leave Feedback >>