| Wednesday, December 03, 2008 |
 |
Khareef
IOC: 2010
Total Production: 3
Production Cost: GBP£400 million
Unitary Cost: GBP£133 million
Origin United Kingdom
Program Status: Under Construction
Contractor/s
VT Shipbuilding
Air-to-Air Missiles:
Mica RF
Guided Missiles:
MM40 Exocet
Guns & Missile Launchers:
Vertical Launch Mica
Protection Systems:
MASS
|
Description:
The Khareef is a class of Ocean Patrol Vessels (OPVs) being built by VT Shipbuilding, a VT Group subsidiary, for the Royal Navy of Oman (RNO). The procurement contract between VT Group and the government of Oman for three ships was signed on January 16, 2007. The Khareef program is slated to last for five years valued at £400 million and will provide initial support. The first ship will be delivered to Oman in early 2010 with the other ships being delivered in six-month intervals.
The Khareef-class ships will be equipped with MASS countermeasures, Exocet anti-ship missiles and VL Mica ship-based air defense system which is based on the beyond visual range Mica air-to-air missile. These key elements of the ship's weapon system have been procured by the Sultanate of Oman separately.
Specifications
Dimensions: Length 100 m
|
|
Notes
(*) lead contractor
IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m) Kilometers (km) Nautic Miles (nm) Inch (in) Yard (yd) Foot (ft) Millimeter (mm)
Pound (lb) Kilogram (kg) kN (KiloNewton) Ton (t)
Meters per Second (mps) Kilometers per Hour (kph) Knot (kt) Miles per Hour (mph)
Liter (l) Galon (gl)
Year (yr) Minutes (min) Second (sec)
Shaft-Horse-Power (shp)
Last Updated: Saturday, November 22, 2008
Leave Feedback >>
|
|
Copyright © 2003 - 2008 deagel.com. All Rights Reserved.