Monday, October 13, 2008

deagel.com

Project 1155


IOC: 1980
Total Production: 13


Also Known As
Fregat
Project 1155.1
Udaloy
Udaloy II


Origin
Russia


Contractor/s
Yantar



Guided Missiles:
3M80 (8)
RPK-4 Musson (8)

SAM & ABM Missiles:
9M311 (64)
9M331 (64)

Aircraft, Vehicles & Crafts:
Ka-25 (2)
Ka-27 (2)

Sensors & Communications:
Fregat MA

Guns & Missile Launchers:
Kashtan (2)
Klinok (8)

Description: The Project 1155/1155.1 Fregat, also knwon as the Udaloy, class destroyers have been designed to engage submarines employing onboard weapons as well as two Ka-27 helicopters. They feature two helicopter hangars and flight deck. These features overcome the shortfalls detected on Krivak-series anti-submarine frigates. In addition, 8 Klinok SAM systems, one 100mm AK-100 multifunction gun and 30mm AK-630 close-in weapons have been provided for ship self-defense.

The project 1155.1, also known as Udaloy II, is an improved derivative of the Project 1155 ship featuring eight Moskit supersonic anti-ship missiles instead of Musson anti-submarine missile, one 130mm two-barrel AK-130 gun replacing the AK-100 gun, and additional 2 Kasthan close-in weapon systems with 64 missiles. There is only a single Udaloy II destroyer in service with the Russian Navy.

Specifications
Accommodation: Crew 250

Guns: Main Gun Caliber 130 mm

Number of Weapons: 72

Dimensions: Beam 19 m, Length 163 m

Weights: Full Displacement 8,500 t

Performance: Top Speed 15 mps (29 kt)

Power: Power 60,000 shp

Operators

Russia / 8


Ships

Admiral Kharlamov

Commissioning: 1989

Admiral Lechenko

Commissioning: 1988

Admiral Panteleyev

Commissioning: 1991

Admiral Spiridonov / Decommissioned

Admiral Vinogradov

Commissioning: 1988

Marshal Vasil'yevskiy

Commissioning: 1983

Severomorsk

Commissioning: 1987

Udaloy / Decommissioned

Commissioning: 1980

Vitse-Admiral Kulakov / Unknown

464 Admiral Zaharov / Decommissioned

543 Marshal Shaposhnikov

Commissioning: 1985

564 Admiral Tributus / Decommissioned

605 Admiral Chabanenko

Commissioning: 1999



Image Gallery


Notes
(*) lead contractor
IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)


Last Updated: Friday, October 10, 2008

Leave Feedback >>