There are 6 images added between 2 December 2006 and 2 October 2010
Juan Carlos I  
Initial Operational Capability (IOC): 30 September 2010
Total Production: 1
Unitary Cost: USD$451 million
Also Known As: Buque de Proyeccion Estrategica and L61
Origin: Spain
Corporations: Navantia
Parent System: Juan Carlos I
Initial Operational Capability (IOC): 30 September 2010
Total Production: 4
Production Cost: USD$2.5 billion
Total Cost: USD$2.5 billion
Family Members: Anadolu and LHD Canberra
Reviews
There are no reviews so far

Description: The LHD amphibious assault ship is being designed by IZAR for the Spanish Navy. The LHD will be able to transport and disembark Spanish Marines forces using landing craft and helicopters. Eventually, it could be able to operate as an aircraft carrier equipped with the Harrier V/STOL aircraft. The LHD will be deployed beyond 2010.

The purpose of the Spanish LHD ship remains uncertain as well as its future. It might be employed to complement Galicia-class ships or to replace Principe de Asturias aircraft carrier. If deployed the LHD will be the biggest ship operated by the Spanish Navy.

Juan Carlos I Specifications

Crew: 243
Troops: 1,200
Dimensions
Beam: 32 meter (105 foot)
Draft: 6.80 meter (22.3 foot)
Length: 231 meter (757 foot)
Performance
Max Range: 9,000 nautical mile (16,668 kilometer)
Speed
Cruise Speed: 19 knot (9.77 mps)
Economical Speed: 15 knot
Top Speed: 21 knot (10.8 mps)
Time
Mission Endurance: 30 day
Weight
Full Displacement: 27,563 ton
CEP: Circular Error Probable
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)

Juan Carlos I News

There are 5 news between
10 Sep 2003 and 27 Dec 2013
Friday, December 27, 2013Turkey Selects LHD Amphibious Assault Ship and Four LCM Landing Crafts from Navantia
Tuesday, March 11, 2008Spanish Navy's Juan Carlos I Landing Helicopter Dock Launched at Ferrol Shipyard
Tuesday, October 9, 2007Navantia and Tenix to Build Two Amphibious Ships for the Royal Australian Navy
Monday, September 15, 2003Spain to Build 4 S-80 Submarines with Air Independent Propulsion
Wednesday, September 10, 2003IZAR to Build a 27,000-ton Class LHD for the Spanish Navy

Operators & Related Equipment


OperatorsItems

Grand Total 11
Auxiliary Vessels
LCM-1Ex4
Combat Aircraft
AV-8B Harrier II Plusx6
Private Aircraft
AB212x6
Support Aircraft
CH-47 Chinookx4
NH 90x6
LAMPS IIIx6

Juan Carlos I Ship Listing


SerialNameStatusLaunch DateCommissionDecommission
L61 Juan Carlos I11 Mar 200830 Sep 2010-

Copyright © 2003-2017 deagel.com website. All rights reserved.
This website has been optimized for HTML 5 and CSS 3.