SNACII  
Initial Operational Capability (IOC): 2023
Total Production: 1
Origin: Brazil
Parent System: SNACII
Initial Operational Capability (IOC): 2023
Total Production: 1
Reviews
There are no reviews so far

Description: The Brazilian Navy Nuclear Submarine Program SNACII is the first nuclear-powered boat developed and built in Brazil with French technical assistance and slated to enter service in 2023. The new nuclear-powered attack submarine is intended to protect Brazil's maritime oil and gas resources offshore. The submarine design according to some pictures released by the Brazilian Navy features sail-mounted diving planes and cross type rudder with at least six torpedo tubes mounted at the bow.

SNACII Specifications

Torpedo Tubes: 6
CEP: Circular Error Probable
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)

Operators & Related Equipment


OperatorsItems

Grand Total 11
 
Copyright © 2003-2017 deagel.com website. All rights reserved.
This website has been optimized for HTML 5 and CSS 3.