Friday, November 21, 2008

deagel.com

F310 Fridtjof Nansen


IOC: April 2006
Total Production: 5


Also Known As
F85


Origin
Spain


Contractor/s
Navantia



Guided Missiles:
NSM

SAM & ABM Missiles:
ESSM
Standard SM-2 Block IIIA

Aircraft, Vehicles & Crafts:
NH90 NFH

Sensors & Communications:
AN/SPY-1F (4)

Guns & Missile Launchers:
76/62 Super Rapid
AEGIS
Mk 41 Tactical Length

Description: The F310-class frigates have been designed to provide Anti-Air Warfare (AAW) and Anti-Submarine Warfare (ASW) capabilities. A flight deck and a hangar will be provided for a single NH90 helicopter. The ship will also feature ESSM surface-to-air missiles and the AEGIS weapon system with the downsized AN/SPY-1F radar antenna. The F310-class frigates will be the first warship all over the world integrating the SPY-1F antenna.

The F310-class frigates will also feature reduced radar cross section for improved survivability. The Norwegian Navy ordered five Nansen-class frigates with deliveries beginning in 2005 through 2009. These frigates will be built between Spain, IZAR as main integrator, and Norway.

On February 17, 2005, Lockheed-Martin released that jointly with IZAR the first AEGIS weapon system aboard the Fridtjof Nansen frigate successfully underwent initial activation at IZAR's shipyards in Ferrol, Spain. This event marked the beginning of the integrated weapon system testing for the F310-class frigates.

On April 5, 2006 the first Fridtjof Nansen frigate was handed over to the Royal Norwegian Navy after six years since the program inception in 2000. The official ceremony took place at Ferrol shipyards in Northern Spain.

Specifications
Accommodation: Crew 146

Guns: Main Gun Caliber 76 mm

Dimensions: Beam 16.3 m, Draft 4.9 m, Length 132 m

Weights: Max Weight 5,130 t

Performance: Cruise Speed 9 mps (18 kt), Top Speed 13 mps (26 kt)

F310 Fridtjof Nansen - Contracts, Orders & Sales

  see transactions report


 



News

Operators

Norway / 5


Ships

F310 KNM Fridtjof Nansen

Commissioning: April 2006

F311 KNM Roald Amundsen

Commissioning: Monday, May 21, 2007

F312 KNM Otto Sverdrup

Commissioning: April 2008

F313 KNM Helge Ingstad

Launch/Keel Laying: Friday, November 23, 2007
Commissioning: 2009

F314 KNM Thor Heyerdahl

Commissioning: 2010



Image Gallery


Notes
(*) lead contractor
IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)


Last Updated: Saturday, October 25, 2008

Leave Feedback >>