Thursday, November 20, 2008

deagel.com

Harpoon


IOC: 1985
Total Production: 7,132

AGM-84H SLAM ER


IOC: 2000
Production: 230
Unitary Cost: USD$1.3 million

Also Known As
AGM-84K Joint Standoff Land Attack Missiles-Expanded Response


Origin
United States of America


Contractor/s
Boeing

Applications
F-15K Slam Eagle
F/A-18A Hornet
F/A-18B Hornet
F/A-18C Hornet
F/A-18D Hornet
F/A-18E Super Hornet
F/A-18F Super Hornet
P-3C Orion
S-3B Viking

Family Members
AGM-84D Harpoon
AGM-84E SLAM
Harpoon Block II
Harpoon Block III
RGM-84D Harpoon

Description: The AGM-84H SLAM ER (Expanded Response) is an upgraded version of the combat-proven land attack SLAM missile. The SLAM ER missile features an extended range an improved aerodynamic performance thanks to the use of planar wings. A new warhead has been provided to the SLAM ER missile for better penetration of hardened targets.

The data link provided to the SLAM ER missile allows pilot to update the target in the terminal phase of the flight. In fact, the pilot can engage a target even if it has no relevant IR signature and reducing collateral damage. The software of the SLAM missile has also been upgraded.

The US Navy has ordered 135 new built SLAM ER missiles and intends to retrofit 600 existing SLAM missiles with the SLAM ER configuration. The improvement program will add new capabilities to the SLAM-ER turning into a true network-centric weapon.

The flex targeting (re-targeting) capability will be available to fleet's SLAM ERs in 2004. Land moving targets (40-50 mph) engagement capability is planned for deployment in October 2005. The US Navy also expects to introduce a land attack capability against moving targets at highway speeds in 2006.

Specifications
Dimensions: Diameter 340 mm, Length 4.4 m, Width 2.2 m

Weights: Max Weight 675 kg (1,488 lb), Warhead 227 kg (500 lb)

Performance: Max Range 278 km (150 nm), Top Speed 237 mps (Mach 0.71)

AGM-84H SLAM ER - Contracts, Orders & Sales

 



News

Operators

see operators map | see family operators map

South Korea / 47
Turkey / 48
United States of America / 735



Image Gallery


Notes
(*) lead contractor
IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)


Last Updated: Saturday, October 25, 2008

Leave Feedback >>