Friday, November 21, 2008

deagel.com

SSN 688 Los Angeles


IOC: 1976
Total Production: 62
Total Program's Cost: USD$56 billion

SSN 688I


IOC: 1988
Production: 23
Unitary Cost: USD$900 million


Origin
United States of America


Contractor/s
General Dynamics
Northrop Grumman

Family Members
SSN 688 (VLS)
SSN 688 Los Angeles

Guided Missiles:
Tactical Tomahawk (12)
Tomahawk Block II (12)
Tomahawk Block III (12)

Torpedoes:
Mark 48 ADCAP

Sensors & Communications:
A-RCI
TB-29
TB-34

Protection Systems:
AN/BYG-1

Description: The SSN 688 Los Angeles-class attack submarines were designed to provide escort for carrier strike groups and hunter-killer capability against soviet ballistic submarines. The end of the Cold War has involved the nuclear attack submarines to counter Third World countries non-nuclear submarines that eventually could threaten sea line of communications.

In addition to the attack and escort role, the Los Angeles-class submarines can assume intelligence collection, special forces delivery, and land-attack missions.

The Improved Los Angeles-class submarines, starting with SSN 751, are quieter, incorporate a new sonar combat suite, and their diving planes have moved from the sail to the bow. The sail in these submarines has been strengthened for breaking through ice. Improved Los Angeles-class submarines are specially suitable for under-ice operation.

Specifications
Accommodation: Crew 134

Dimensions: Length 110 m, Width 10 m

Weights: Max Weight 7,150 t

Performance: Max Operating Depth 450 m (1,476 ft), Service Life 30 yr, Top Speed 15 mps (30 kt)

Power: Power 35,000 shp

Other: Torpedo Tubes 4

News

 

Operators

United States of America / 23


Ships

SSN 751 USS San Juan

Commissioning: 1988

SSN 752 USS Pasadena

Commissioning: 1989

SSN 753 USS Albany

Commissioning: 1990

SSN 754 USS Topeka

Commissioning: 1989

SSN 755 USS Miami

Commissioning: 1990

SSN 756 USS Scranton

Commissioning: 1991

SSN 757 USS Alexandria

Commissioning: 1991

SSN 758 USS Asheville

Commissioning: 1991

SSN 759 USS Jefferson City

Commissioning: 1992

SSN 760 USS Annapolis

Commissioning: 1992

SSN 761 USS Springfield

Commissioning: 1993

SSN 762 USS Columbus

Commissioning: 1993

SSN 763 USS Santa Fe

Commissioning: 1993

SSN 764 USS Boise

Commissioning: 1992

SSN 765 USS Montpelier

Commissioning: 1993

SSN 766 USS Charlotte

Commissioning: 1994

SSN 767 USS Hampton

Commissioning: 1993

SSN 768 USS Hartford

Commissioning: 1994

SSN 769 USS Toledo

Commissioning: 1995

SSN 770 USS Tucson

Commissioning: 1995

SSN 771 USS Columbia

Commissioning: 1995

SSN 772 USS Greenville

Commissioning: 1996

SSN 773 USS Cheyenne

Commissioning: 1996



Image Gallery


Notes
(*) lead contractor
IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)


Last Updated: Saturday, October 25, 2008

Leave Feedback >>