There is 1 images added on 4 March 2010
AN/APY-9  
Initial Operational Capability (IOC): 2010
Total Production: 75
Unitary Cost: USD$43 million
Also Known As: Advanced Hawkeye radar and AHE radar
Origin: United States of America
Corporations: Lockheed Martin
Parent System: AN/APY-9
Initial Operational Capability (IOC): 2010
Total Production: 75
Reviews
There are no reviews so far

Description: The Advanced Hawkeye (AHE) radar is being developed by Lockheed-Martin to provide next-generation E-2C aircraft with enhanced warning and battle management capabilities. In August 2003, Lockheed-Martin was awarded a $413 million contract by Northrop-Grumman to begin the system development and demonstration phase (SDD). The AHE radar will also meet the US Navy's requirements for littoral surveillance and theater air and ballistic missile defense missions. The Lockheed-Martin team includes Northrop-Grumman Electronic Systems and Raytheon Electronic Systems. Two Engineering Development Models and four pre-production radar systems will be used by Northrop-Grumman for qualification.

The new radar will fit into approximately the same space as the housing for the AN/APS-145, the current Hawkeye's radar system. The AHE radar will be more sophisticated and complex than the APS-145. The US Navy expects to had fully replaced the APS-145 radar on the 75 Advanced Hawkeye planned to be in service by 2020.

AN/APY-9 Applications


Support Aircraft E-2D Advanced Hawkeye

AN/APY-9 News

There are 10 news between
30 Apr 2007 and 1 Jun 2015
Monday, June 1, 2015FMS: Japan Requests Four E-2D Advanced Hawkeye Airborne Early Warning and Control Aircraft
Friday, July 30, 2010US Navy Takes Delivery of First Production E-2D Advanced Hawkeye Aircraft
Thursday, March 4, 2010AN/APY-9 Airborne Early Warning Radar Enters Low-Rate Initial Production
Friday, October 16, 2009E-2D Advanced Hawkeye Successfully Completes First Catapult Launch Tests
Monday, September 21, 2009Northrop Grumman Delivers Final Production E-2C Hawkeye
Monday, June 15, 2009E-2D Advanced Hawkeye Program Awarded US Navy Low-Rate Initial Production Contract
Wednesday, June 10, 2009E-2D Advanced Hawkeye Begins Next Phase of Flight Testing
Thursday, November 13, 2008E-2D Advanced Hawkeye Completes Operational Assessment
Thursday, July 19, 2007Northrop Grumman Awarded Production Contract for Three E-3D Advanced Hawkeyes
Monday, April 30, 2007Northrop Grumman Unveils First US Navy E-2D Advanced Hawkeye

Operators & Related Equipment


OperatorsItems

Grand Total 751
 
Copyright © 2003-2017 deagel.com website. All rights reserved.
This website has been optimized for HTML 5 and CSS 3.