Friday, March 19, 2010

deagel.com

AN/SPY-1


IOC: 1983
Total Production: 436

AN/SPY-1F


IOC: 2003
Production: 20


Origin
United States of America


Contractor/s
Lockheed Martin

Applications
AEGIS
F310 Fridtjof Nansen
MEKO A-200 (AAW)

Family Members
AN/SPY-1A
AN/SPY-1B
AN/SPY-1D
AN/SPY-1E

Description: The AN/SPY-1 radar system is the primary air and surface radar for the AEGIS weapon system. It is a multifunction phased-array radar capable of search, automatic detection, transition to track, tracking of air and surface targets, and missile engagement support. Typically each AEGIS-equipped ship has 4 SPY-1 radar antennas continuously covering 360-degree and providing a search and tracking capability for hundreds of targets at the same time.

The SPY-1 also provides fire control capability, rapid transition from silent to full radiate mode, fast reaction semi-automatic system in less than10 seconds, high rate of fire (less than 2 seconds per launcher), illumination required only for a short period of time prior intercept, and other minor capabilities. The SPY-1 radar system also has some weakness such as false targets from land clutter, re-engage no possible, antenna height lower than other radar systems resulting in reduced radar horizon, and target engagements must be carried out by the SPY-1 radar unless equipped with Cooperative Engagement Capability (CEC).

The SPY-1 radar system was developed in the 1970s. The SPY-1F radar antenna is a modified version of proven SPY-1D installed aboard Burke-class destroyers, as well as other ships worldwide. The new radar demonstrates SPY-1 adaptability, flexibility and scalability. SPY-1F has been tailored for frigate/corvette-sized ships. SPY-1Fs are planned for installation aboard five Norway's Nansen-class frigates to be commissioned beginning in 2005. The first SPY-1F radar was activated early in 2005 aboard Norway's Fridtjof Nansen frigate.

News

 

Operators

Norway / 20

Notes
(*) lead contractor
IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)


Last Updated: Sunday, March 07, 2010

Leave Feedback >>