Ground Forces :: Wheeled Armored Fighting Vehicles :: FRES  
 
 
 
 

FRES


Program Status: Under Development
IOC: 2012
Total Production: 3,500
Derived from: Piranha IV 8x8

Also Known As: Future Rapid Effects System and Piranha 5

Origin: United Kingdom

Contractor/s: Atkins

Description: The Future Rapid Effects System (FRES) is a new modular armored vehicle designed to replace current armored vehicles in the British Army. It will meet requirements for rapid deployable forces while providing enhanced protection and survivability over current heavyweight armored vehicles. It is also intended to fill the gap left by the cancelled Multi Role Armored Vehicle (MRAV) program. FRES systems are expected to enter service by 2010.

The FRES is envisaged as the British counterpart to the American FCS program. It will be designed to provide netted combat capability and full compatibility with the digitized battlefield. Ranging from combat to combat support services roles, the FRES will replace many types of existing armored vehicles in the British Army. The FRES vehicles will feature maximum commonality at platform, subsystems and component levels.

In early May 2004, the MoD launched the FRES program with a two-year assessment phase. The purpose of this phase is to select a Systems House, prime contractor, for the FRES program. The Systems House will determine the technologies, capabilities, industrial partners, total number of FRES vehicles and roles needed by the British Army. Atkins Defence was selected by the UK MoD to perform the Systems House role on October 6, 2004. Atkins will perform the 24-month assessment phase of the FRES project.

 

:: Reviews ::

There are 0 reviews
so far

Write your review


 


 

:: Specifications ::


Wheel Drive: 8x8

:: News ::

There are 18 news between
17 Jul 2003
and
8 May 2008

1  2  

:: Operators ::

Operators
  Country   Items   Country   Items
  United Kingdom 3,500        

 

fully confirmed operational planned retired cancelled destroyed    

:: Image Gallery ::

There are 12 images added between
3 Dec 2006
and
13 May 2008

1  2  

:: Notes & Resources ::

 

Last Updated:
Thursday, March 8, 2012

(*) lead contractor

IOC: Initial Operating Capability
FOC: Full Operating Capability
CEP: Circular Error Probable
Comm: Commissioning Date
Meters (m)   Kilometers (km)   Nautic Miles (nm)   Inch (in)   Yard (yd)   Foot (ft)   Millimeter (mm)
Pound (lb)   Kilogram (kg)   kN (KiloNewton)   Ton (t)
Meters per Second (mps)   Kilometers per Hour (kph)   Knot (kt)   Miles per Hour (mph)
Liter (l)   Galon (gl)
Year (yr)   Minutes (min)   Second (sec)
Shaft-Horse-Power (shp)

Leave Feedback | Operators map | Compare Wheeled Armored Fighting Vehicles

 
Copyright © 2003-2012 deagel.com All rights reserved